The EU-CIRCLE methodology and Critical Infrastructure Resilience Platform (CIRP) were tested and validated through a case study which assessed the impacts of heat waves and forest fires on the electric and road transport networks of the Provence-Alpes-Côtes d’Azur Region (south east of France). CEREN and ARTELIA developed the case study scenario in collaboration with the critical infrastructure operators: RTE (electric transportation network operator), ENEDIS (electric distribution network operator) and ESCOTA (highway network operator).
Find more at http://www.eu-circle.eu/wp/research/case-studies/case-study-1/